RAIPUR SIGMA SECTION NH-200
GANGA BRIDGE SAIDPUR (UP)
LONGACERS PROJECT

S.No.

Project Name

Client / Owner

Scope

Remarks

1

Rehabilitation and Upgrading of Existing 2-lane road to 4 Lane Divided Carriageway Configuration from Km 85 to Km 103 of NH-3 in Madhya Pradesh.

NHAI

Preparation of Feasibility and Detailed Project Report for rehabilitation & upgrading with detailed design of one major bridge of 240m long (6 x 40 m), 4 minor bridges, and numerous culverts.

Completed

2


Four-laning and strengthening of Existing Two Lane Stretches from km 29.5 to 62 of NH-4 in the State of Karnataka

NHAI

As independent consultant Project Monitoring, Supervision, and Review of Detailed Design for the construction of 32.5 km 4 lane road, 1 major flyover, 10 no. of minor bridges, 54 culverts, 4 pedestrian underpasses, and two toll plazas was being carried out. The project has been implemented on BOT basis.

Completed

3

Four Laning of Rajahmundry Tuni Section of NH-5 in Andhra Pradesh.

NHAI

As an Independent consultant. Project Monitoring, Supervision, and Review of Detailed Design for the construction of 100 km 4 lane road, 3 major bridges, and no. of minor bridges, culverts, and pedestrian underpasses. The project has been implemented on BOT basis

Completed

4

Construction of 125 km Almorah – Lohaghat Motor Road from Single Lane to 2-Lane to NH Standard under CRF

Uttrakhand PWD

Survey Investigation and Preparation of DPR

Completed

5

Construction of 181 km Almorah – Karnaprayag Motor Road from Single Lane to 2-Lane (NH Standard) under CRF

Uttrakhand PWD

Survey Investigation and Preparation of DPR

Completed

6

Development of FOB's Pedestrain Subways and Underpass at seven Locations in NDMC area.

NDMC (New Delhi Municipal Corporation)

Design of Pedestrian Steel Foot over bridges at Africa Avenue, Mother Teresa Crescent and RML Hospital in Delhi in which Delhi Integrated Multi-Modal Transit System Ltd (DIMTS) were project management consultants and AB lall Architects were the architect

Completed

7

Four laning of Moradabad Bareilly Section of NH24 in the State of Uttar Pradesh under NHDP Phase-III Programme

NHAI

Preparation of detailed design and drawings for 15 bridges (6 ROBs, 3 river bridges, and 6 Vehicular Underpass in JV with B&S Engineering Consultants Pvt ltd.

Completed

8

Six Laning of Existing Three Lanes for Bagodara-Wataman-Tarapur-Vasad Road SH-8, Km 0/0 to Km 101/9 in the State of Gujrat on build , operate and transfer (BOT) basis.

Neel Construction Pvt. Ltd.

Preparation of detailed design and drawings for 4 Rail over Bridges and one River Bridge across River Sabarmati

Completed

9

4/6 Lanning of Gaziabad-Aligarh Section of Bot Road Project on NH-91 from LM 23+600 to 119+900.

NHAI / PNC Infratech Limited

Preparation of detailed design and drawings for Rail over Bridges with a maximum span of 64m with 71-degree skew at Khurja

Completed

10

Detailed Project Report for Package DS1 & DS2 (km. 74.5 to Km. 109.95) of Ahmedabad-Dholera State Expressway-1

Stanley Consultants (India) Pvt. Ltd.

Preparation of detailed design and drawings for 3 River Bridges (375m, 300m, and 225m Long), 4 flyovers, and 4 interchanges .1. We carried the designs on behalf of Stanley Consultants (India) Pvt. Ltd.

Completed

11

4/6Lanning of  Varanasi-Shaktinagar Corridor of SH-05A on DBFOT Basis

Uttar Pradesh State Highway Authority

Preparation of detailed design and drawings for the construction of 3-grade separator of lengths 1000m, 2000m, and 3000m, 5 Rail Over Bridges, 13 Minor Bridges, 1 Major Bridge, 3 VUP, 3 CUP, toll plazas, and 160 culverts.

Completed

12

6 laning of Barwa-Adda-Pangarh Section of NH-2 from km 398.24 to km 521.120 including Pangarh Bypass in the state of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern

NHAI

Preparation of detailed design and drawings for One Grade Separator and One ROB in JV with B&S Engineering Consultants Pvt ltd.

Completed

13

Four Laning of  Kiratpur to Ner-chowk Section of NH-21 from km 73.2 to km 186.5 in the states of Punjab & Himachal Pradesh on DBFOT Pattern under NHDP Phase III.

NHAI

Preparation of detailed design and drawings for 17 Major and 5 Minor Bridge in JV with B&S Engineering Consultants Pvt ltd.

Completed

14

Design of navigational portion of 4 bridges over river Ganga in Mirzapur and Ghazipur District of Uttar Pradesh

UP State Bridge Corporation

Preparation of detailed design and drawings of a navigational portion of bridges over river Ganga that are integral and continuous for 4 to 5 spans with spans ranging from 110 to 125m and proposed to be constructed by cantilever construction technique. The design has been done in association with B & S Engineering Consultants Pvt. Ltd.

Completed

15

Improvement of Balance Works of Ranchi Ring Road Section-VII Package ID :RRR VII

Jharkhand Accelerated Road Development Company Limited

Preparation of detailed design and drawings of 1 flyover, 3 major bridges, 6 minor bridges, and 7 vehicular underpasses including nondestructive testing of partly constructed structures.

Completed

16

Four/Six Lanning of Raipur- Simga  Section of NH 200 (New NH 30) (Package I) from Km 0+000 to Km 48+580 (Total Length 48.580Km) Section of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC Mode.

NHAI / Punj Lloyd Ltd

Preparation of detailed design and drawings of 10 Vehicular underpasses, 8 minor bridges, 2 major bridges, 2 flyovers, and numerous culverts. The design has been done in association with B & S Engineering Consultants Pvt. Ltd.

Completed

17

Detailed Engineering Service for Dr. Ram Manohar Lohia Path Chakra

Bihar Rajya Pul Nirman Nigam Ltd. ,Patna

Preparation of detailed design and drawings of Integral Spine Beam Bridge & U-Shaped Underpass at Lalit Bhavan Crossing, Patna

Completed

18

Consultancy Service for Feasibility-Cum-Geo Technical Study For Bypass to Shirdi Ghat From Km 238.00 to 261.45 on NH-48 in the State of Karnataka

Geoconsult India Pvt. Ltd.

Preparation of detailed design and drawings of 10 Vehicular underpasses, 8 minor bridges, 2 major bridges, 2 flyovers, and numerous culverts.

Completed

19

Proposed P.S.C Box Girder Bridge at Mandi Poonch in Jammu & Kashmir

Jammu & Kashmir Project Construction Corporation Ltd.

Preparation of detailed design and drawings of 100m Long (2x50m) P.S.C Box Girder 

Completed

20

Construction of Elevated Road Corridor from AAIMD (on NH-98) to Digha (on Ganga Path) (11.90Km) At Patna in the State of Bihar

Bihar State Road Development Corporation Ltd./  Gammon India Ltd.

Preparation of detailed design and drawings of steel concrete composite superstructure of 25+40+25m continuous cable-stayed (pseudo) superstructure between Pier P143-P144-P154-P155 of the elevated corridor between AIIMS to Digha in Patna,106m span through truss type superstructure for the span between Pier P27-P29 (ROB) at chainage 3.015,35m span curved superstructure between Pier P11-P12 (having a circular curve of radius 400m), 35m span straight superstructure between Pier P119-P120.


Completed

21

Six Lanning of Samakhiali-Gandhidham section (Km 306.02 to 362.16 ) in State of Guharat on DBFOT Basis

NHAI 

Consultancy Services for finalization of methodology for repair and rehabilitation of existing structures (5 major bridges, 3 ROBs, 6 VUP's, 23 minor bridges, and 18 slab culverts)

Completed

22

Elevated Road on NH-15/54 and UBDC Canal Along ROBB at Lvevel Crossing on A-12 Near Amritsar City in the State of Punjab on EPC Mode

Public Works Department Government of Punjab / M/S Brahmaputra Infrastructure Limited

Preparation of detailed design and drawings of  steel concrete composite superstructure of 34.28m span (37-degree skew) for ROB at level crossing number A-12 near Amritsar City

Completed

23

Proposed ROB and Its Approaches In Liieu of L-Xing No. -26 at Railway Km. 341/4-5 on Bathunda-Ferozepur Rail Section and on NH-15 (New NH-54) Section Farikot to Kotkapura Road at Km 235.240 at Kotkapura.

Executive Engineer Central Works Division PWD B&R Ferozpur. / Brahmaputra Infrastructure Limited.

Preparation of detailed design and drawings of design of 40.7m steel concrete composite superstructure for ROB in lieu of level crossing no S-26 at Railway km 341/4-5 on Bhathinda-Ferozpur Rail Section.


Completed

24

Six Laning of Greenfield Udaipur Bypass (connecting NH-76 at Km 118+500 at Debari to NH-8 Km 287+400 at Kaya village) of Length 23.883 Km on Hybrid Annuity Model (Package-IV)

NHAI / S P Singla Constructions Pvt. Ltd.

Consultancy Services for the design of four Minor Bridges at Ch. 7+836, 19+415, 21+425, and 22+255 at Debari to NH-8 Km 287+400 at Kaya village) of Length 23.883 Km on Hybrid Annuity Model (Package-IV) 

Completed

25

Construction of Elevated LCW on NH-31 in Kishanhganj Town in the State of Bihar.

NHAI / S P Singla Constructions Pvt. Ltd.

Proof checking of design and drawings of 3 km long elevated viaduct in Kishanganj, Bihar 

Completed

26

Construction of Eight lane divided carriageway starting at Sohna-Gurugram Road (NH 248A) near Alipur Village and Ends at Ch: 18+461 Before the KMP Expressway (CH:0+00 to Ch:18+461) Section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC mode Under Bharatmala Pariyojana in the State of Haryana

NHAI/B&S Engiuneering and design consultant Pvt Ltd

Preparation of detailed design and drawings of  design of 60m span steel concrete composite superstructure

Completed

27

Construction of Ring Road Bypass from Salimgarh Fort to Velodrme Road Package -1 Flyover/Stilled Portion ETC from Ring Road & Velorome Road Jn. (R.D.0+00) to Back of Rajghat Power Station (Approx R.D 1+800)

Public Work Department Government of NCT Delhi

Preparation of detailed design and drawings of  Superstructure for an elevated portion of Ring Road Bypass in Delhi involving the design of more than 20 modules (covering a deck area of 65000 square meters) of two to four span continuous. Modules in straight parts were made of Precast pre-tensioned girders of approximately 30m lengths with in-situ deck slab, post-tensioned cast-in-situ box girder, and voided slab were used for the curved part of the elevated road.

Completed

28

Construction of Bridge Over River Ganga At Shivpur Ghat (Near Nauranga) on Dokari-Nauranga Marg In District Ballia (U.P)

Bridge Construction Unit - Ballia (U.P State Bridge Corporation Ballia Uttar Pradesh)

Preparation of detailed design and drawings for the construction of 1880.00m long Major Bridge Across River Ganga on NH-31 Nauranga Marg Shivpur Ghat

Ongoing

29

Const. of Nagpur-Mumbai Super Communication Expressway (Maharashtra amruddhi Mahamarg) on EPC mode for Package 5, From Km. 217.023 to Km. 259.900 in District Washim, Maharashtra.

Mahrashtra State Road Development Corporation Ltd. / B&S Engineering Consultants Pvt Ltd.

Preparation of detailed design and drawings of POPs, VOPs, WOPs, and ROBs

Ongoing

30

Construction of 90M Span Bridge Over River Ravi on Rajera TO Bali Road at Bhania Km 0/140 (SH-Construction of 90M Span Steel Truss Bridge Along Approaches under PMGSY Package No.  HP-02-313 Batch-1 For Year 2018

Himachal Pradesh Public Works Department / V.K GUPTA & ASSOCIATES ENGINEERS & CONTRACTORS

Preparation of 90m Span span through Truss Bridge with multiple hollow box type abutment of over 25m height over River Ravi on Rajera to Bali Road at Bhania.

Ongoing

31

Four laning of Munger to Mirjachowki (NH80) Section from Rasulpur to Mirjachowki – design chainage km 157+350 to km 193+931 (Package 4) on Hybrid Annuity Mode.

NHAI / APCO Infratecf Pvt. Ltd.

Preparation of detailed design and drawings of  Bridges, ROBs, VUPs, and Culverts and Carrying out Geotechnical Investigation

Ongoing

32

Construction of  Uni-Directional Khellani Tunnel of Length 1.574 Km & its Approach Road From Km 29.030 to Km 31.449 to Total Length of 2.419 Km on NH-244 In Union Terrritory of Jammu & Kashmir on EPC mode

NHIDCL / APCO Infratecf Pvt. Ltd.

Consultancy Services for the design of Structures pertaining to the construction of Uni-Directional Tunnel of Length 1.574 km and its approach road from km 29.030 to 31.449 of total length 2.419 km on NH 244

Ongoing

33

Four Laning of Existing 2-Lane Road of Amritsar-Ghoman-Tanda-Una Section of NH-503A From design Chainage Km. 8+270 to Design Chainage Km. 54+000 (Design Length 45.73 Km) in the state of Punjab on Hybrid Annuity Mode (Package -I) Under NH (O)

NHAI / Chetak Enterprisec Limited

Consultancy Services for the design of highways and structures including all field investigations 

Ongoing

34

Construction of Eight Lane acess controlled Expressway from Km 3.000 to Km 20.000 (Shirsad to Akolij section- Spur of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybid Annuity mode Under Bharatmala Pariyojana.

IRCON International Ltd. / Apco Infratech Pvt. Ltd

Preparation of detailed design and drawings of Vehicular underpasses, 4 Small Vehicular underpasses,9 Light Vehicular underpasses,7 Major Bridges cum Viaduts,1 Interchange, and numerous culverts.

Ongoing

35

Construction of 6-Lane Greenfield Connectivity to Jewar International Airport from DND-Faridabad-Ballabhgarh Bypass KMP Link-Spur to Delhi Mumbai Expressway on Hybrid Annuity mode in State of Haryana and Uttar Pradesh under Bharatmala Pariyojna.

NHAI / APCO Infratecf Pvt. Ltd.

Preparation of detailed design and drawings of 7 Vehicular underpasses, 4 Small Vehicular Underpass, 12 Light Vehicular Underpass,1 Major bridge, 3 Interchange, 9 Flyovers,1 ROB, 8 Minor Bridges cum viaducts, and numerous culverts.

Ongoing

36

Pre-bid Consultancy services for 10 km long elevated highway in Panipat for IJM (India) Ltd in connection with six laning of NH-1

IJM (India) Pvt. Ltd.

Tender Stage design of the elevated road consisted of a number of modules of a minimum continuous length of 150m & Precast segmental PSC Box girders resting on pile foundations were proposed for the superstructure.

Completed

37

Pre-bid Consultancy services for Conversion of Delhi Gurgaon Section of NH-8 to 8 lane access Controlled Expressway for Road Builders Malaysia Bhd.

Road Builders Malaysia Bhd.

Delhi Gurgaon Section of Nh-8  was proposed as 8 lanes 28 km long access controlled expressway. Tender Stage design of 8 flyovers, three toll plazas, and other structures.

Completed

38

Pre-bid Consultancy services for Four laning of NH47 from Salem to Kumarpalayam (km 1.6 to 53.52) on BOT Basis.

Road Builders Malaysia Bhd.

Traffic survey, projection, preliminary design, cost estimate, and financial analysis were performed

Completed

39

Pre-bid Consultancy services for Four laning of NH47 from Kumarpalayam to Changapalli (km 53.52 to 100) on BOT Basis.

Road Builders Malaysia Bhd

Traffic survey, projection, preliminary design, cost estimate, and financial analysis were performed

Completed

40

Pre-bid Consultancy services for Construction of Govindgarh-Nabha-Bhawanigarh Road on BOT Basis in Punjab for 55.42 km.

TCIL

Traffic survey, projection, preliminary design, cost estimate, and financial analysis were performed

Completed

41

Pre-bid Consultancy services for Construction of Hoshiyarpur Phagwara Road on BOT Basis in Punjab Length 35.5 km.

TCIL

Traffic survey, projection, preliminary design, cost estimate, and financial analysis were performed

Completed

42

Pre-bid Consultancy services for Four Laning of Panikoili-Rimuli Section of NH-215 from Km 0.000 to Km 163.00 in the State of Orissa under NHDP Phase IIIA on BOT Basis..

TCIL

Traffic survey, projection, preliminary design, cost estimate, and financial analysis were performed

Completed

43

Pre-bid Consultancy services for Six lane access-controlled highway from design chainage 0+000 (Ganeshpur) to design chainage 8+130 (near Mohand) of Ganeshpur Dehradun section of NH-72a in the state of Uttar Pradesh under Bharatmala Pariyojna (Package -1) on EPC mode.

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

44

Pre-bid Consultancy services for Construction of 4-Lane Expressway from km 96.000 to km 127.000 of Baireddypalle to Bangarupalem Section in the State of Andhra Pradesh of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna (Phase-II Package-II)

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

45

Pre-bid Consultancy services for four lane ring road/bypass around Srinagar city from km 0.000 to km 42.100 (phase-i) on engineering, procurement and construction (epc) mode under NHDP Phase VII in the UNION TERRITORY OF JAMMU AND KASHMIR under Bharatmala Pariyojana.

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

46

Pre-bid Consultancy services for four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from MDR Junction at ch. 40+900 Dhunda Village to Junction with NH3 and Taran Bypass near Mannawalla village chainage 70+950 (km 40+900 to km 70+950 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

47

Pre-bid Consultancy services for four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70+950 to Junction with NH354 Ajanala road near Harsh china village chainage 99+020 (km 70.950 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

48

Pre-bid Consultancy services for Construction of eight-lane access controlled expressway from km 20+200 to km 43+000 (Akloli to Amne Section – SPUR of Vadodra Mumbai Expressway) in the state of Maharashtra under Hybrid Annuity Mode under Bharatmala Pariyojna (phase II – Package XV)

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

49

Pre-bid Consultancy services for Construction of eight-lane access controlled expressway from km 43+000 to km 69+800 (Amne to Bhoj Section – SPUR of Vadodra Mumbai Expressway) in the state of Maharashtra under Hybrid Annuity Mode under Bharatmala Pariyojna (phase II – Package XVI)

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

50

Pre-bid Consultancy services for construction of double Decker elevated road for Kargil Chowk, Ghandi Mandi to Science College VIA PMCH Patna.

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

51

Pre-bid Consultancy services for Development of Jakh (Vijaypur)-Kunjwani section of NH-44 to six-lane expressway standards as part of Delhi-Amritsar-Katra Expressway (Km 503+200 to Km 515+000 of Delhi-Amritsar-Katra Expressway) including development of Kunjwani to 4th Tawi Bridge section of NH-144A to Two/Four- Lane NH standards [Ch 0+000 to 7+350 of NH-144A; Spur connectivity to Jammu Airport.] in the UT of Jammu & Kashmir on Hybrid Annuity mode.

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

52

Pre-bid Consultancy services for Construction of Flyover at Nagpur RTO Square to Nagpur University Campus and at WADI/MIDC Junction on Nagpur Amravati Road

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

53

Pre-bid Consultancy services for Construction of Four Laning of NH-7 from Madanapalle (Design chainage 0+000 km) to Pileru (Design chainage 55+900 km) on HAM mode in the State of Andhra Pradesh under BMP

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

54

Pre-bid Consultancy services for Construction of 6 Lane Greenfield Connectivity to Jewar International Airport from DND-Faridabad-Ballabhgarh Bypass KMP Link- Spur to Delhi Mumbai Expressway on Hybrid Annuity mode in State of Haryana and Uttar Pradesh.

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed

55

Pre-bid Consultancy services for Development of 4-6-lane Access Control Exp. from Design Chainage Km 515.000-Km 528.300 (Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km 550.900-Km 566.520 (Domel to Katra Section) on HAM under BMP in the UT of JK. (Phase-II-PKG-XVII)

APCO Infratech Pvt. Ltd.

Preliminary design, Value engineering & Bill of quantities

Completed